Our workshop has performed a comprehensive repair of the Liebherr DPVPO 108 hydraulic pump. A specific problem during the repair is always the search for spare parts. Our company specializes in supplying components for construction machinery, which is extremely useful during such a process. Having our own warehouse and an extensive network of contacts, we are not dependent on a single source of parts, which translates into the possibility of offering customers a larger number of available options during the repair.
Pump disassembly and verification
Everything starts with a thorough diagnosis. Only after disassembling and breaking down the pump into proverbial "first factors" can it be determined what needs to be replaced and which elements need to be regenerated.
It is worth considering the filtration of hydraulic oil at this point - our service can carry out such a process at the customer's request, and we recommend reading about its advantages in a separate article on our blog.
Returning to the main topic, in the case of DPVPO, the basic elements of the hydraulic pump ensuring its proper operation turned out to be unfit for further use: both rotary groups, rings on control pistons, a set of bearings, seal sets, control pump.
Replacement, regeneration and cleaning
The next stage was a thorough cleaning of the remaining elements that were suitable for regeneration. It is very important to get rid of all impurities and deposits that could affect the quality of the pump after regeneration.
Proper preparation of the working surfaces guarantees precise assembly of individual pump elements.
We strive to ensure that the elements subjected to regeneration are restored to their factory parameters as much as possible and can be successfully used in further operation. Hydraulic power, especially hydraulic pumps, must be precisely adjusted to perform their role well in the entire hydraulic system.
Pump assembly
The next step in the repair of the hydraulic pump is the assembly of replaced and regenerated elements - accuracy is key here. All parts must be properly seated and assembled to prevent future failures and ensure the correct operation of the entire subassembly. Thanks to our warehouse resources, we were able to obtain the components corresponding to the DPVPO pump without unnecessary delay.
What does the offer look like?
At this point, it is worth explaining what the offer in our company looks like, as we can almost always offer the customer an alternative solution for the repair. Very often we have in stock a pump identical or similar enough to the one being repaired that we simply offer to buy this pump. As part of the settlement, we take the old copy, which is then completely disassembled, and individual elements are selected for possible future repairs.
Performance and load tests
We rebuilt the DPVPO pump based on the supplied spare parts, and then it underwent a final inspection. To fully confirm the effectiveness of the repair work carried out, the pump was sent to a diagnostic station, where it underwent a series of appropriate tests. After passing the entire test cycle, the pump was painted and secured for shipping.
We always provide our customers with support at every stage of the repair, offering professional advice on technical issues or regarding the purchase of parts or complete subassemblies. Our offer always tries to best reflect the specific needs of the customer.