# Will the Engine Go Back Into the Crane? First Start After the Overhaul – Liebherr LTM 1080

> Video: Second stage of the engine overhaul for a Liebherr LTM 1080 crane: about 30 hours of running-in on the dyno, cleaning the engine bay, installation in the crane, filling fluids, bleeding, computer calibration and a road test.

[▶ Will the Engine Go Back Into the Crane? First Start After the Overhaul – Liebherr LTM 1080](https://www.youtube.com/watch?v=LL5MH5ZgRVI)

Second stage of the engine overhaul for a Liebherr LTM 1080 crane: about 30 hours of running-in on the dyno, cleaning the engine bay, installation in the crane, filling fluids, bleeding, computer calibration and a road test.

[**Read the full repair report →**](https://wibako.com/about-us/news/827-will-the-engine-go-back-into-the-crane-dyno-and-first-start-after-the-overhaul-liebherr-ltm-1080)

Published: 2026-05-08

---

Source: https://wibako.com/about-us/video/826-will-the-engine-go-back-into-the-crane-first-start-after-the-overhaul-liebherr-ltm-1080
Contact: +48338704200, biuro@wibako.pl
