# Overhaul of the Cummins QSB 4.5 Engine in the Terex Pegson Metrotrak Crusher

> The overhaul of the Cummins QSB 4.5 engine in the Terex Pegson Metrotrak crusher is a comprehensive process that includes diagnostics, disassembly, regeneration, and testing on a dynamometer. Discover how we ensure the reliability and efficiency of power units in challenging operating conditions.

## Engine Overhaul of the Cummins QSB 4.5 in a Terex Pegson Metrotrak Jaw Crusher

Jaw crushers operate in demanding conditions, where the diesel engine must provide stable power regardless of workload intensity and the type of material being processed. One machine designed for these applications is the **Terex Pegson Metrotrak**, a compact jaw crusher used for crushing stone, concrete and other construction materials. Its mobile design allows it to operate directly on construction sites, at recycling facilities and in aggregate processing operations.

The machine is powered by a **Cummins QSB 4.5** diesel engine, belonging to a family of power units widely used in industrial and construction machinery. Its four-cylinder design, turbocharging and electronic engine management provide the performance required to drive equipment operating under heavy loads. In the Metrotrak jaw crusher, the condition of the engine directly affects the efficiency of the entire crushing process.

In the case described, a comprehensive repair of the Cummins QSB 4.5 engine was required. The reason for the overhaul was a gradual loss of power accompanied by increased engine oil consumption. These symptoms indicated possible wear of the crankshaft and piston assembly. To determine the actual extent of the damage, we carried out preliminary diagnostics, followed by engine removal and transportation to our workshop facilities in Kojszówka, Poland.

At WIBAKO, we provide comprehensive servicing of diesel engines used in construction, industrial and road machinery. Our services include engine removal and installation, component reconditioning and complete engine overhauls. An important part of our work is the ability to test rebuilt engines on our engine dynamometer before they are installed back into the machine.

### Initial Diagnostics of the Cummins QSB 4.5 Engine Before Removal from the Terex Pegson Metrotrak

Before starting the removal process, we carried out initial diagnostics of the Cummins QSB 4.5 directly in the Terex Pegson Metrotrak jaw crusher. The first stage involved assessing the general technical condition of the engine and analysing the symptoms reported during operation. Particular attention was paid to increased oil consumption, engine behaviour at idle and its response when the load increased.

We checked the engine oil level, the condition of operating fluids, the tightness of the lubrication system and any visible signs of leakage around the engine. We also inspected the air intake system, air pipes and turbocharger connections. In an engine operating inside a crusher, it is particularly important to rule out intake leaks, as contaminants entering the cylinders can accelerate wear of the liners, pistons and piston rings.

Next, we checked the engine operating parameters. The inspection included oil pressure, operating temperature and engine response to changes in load. We also used electronic diagnostics to check for stored control unit fault codes and available operating parameters. This helped us determine whether the loss of performance could have been related to irregularities in the engine management system or fuel system.

Due to symptoms suggesting possible wear of the cylinders and pistons, we carried out additional diagnostic procedures. An important part of the assessment involved checking compression pressure and cylinder leakage. When increased oil consumption occurs, it is particularly important to determine whether the piston rings are sealing the combustion chamber correctly and whether excessive amounts of oil are entering the combustion chambers.

The diagnostic results indicated that a detailed mechanical inspection was necessary. Simply correcting potential faults in the engine accessories would not have solved the problem if the underlying cause was wear of internal components. We therefore decided to remove the engine and carry out a comprehensive overhaul.

### Removal of the Cummins QSB 4.5 Engine from the Terex Pegson Metrotrak Crusher

Removing the power unit from the Terex Pegson Metrotrak crusher requires proper preparation of the work area and protection of all systems connected to the engine. We began by switching off the machine, securing it against accidental starting and disconnecting the electrical system. We then drained the operating fluids and prepared the connections that needed to be disconnected.

First, we removed the accessories and installation components that obstructed access to the engine. We disconnected the fuel lines, electrical connections, cooling system hoses and components of the intake and exhaust systems. Particular attention was paid to the air pipes supplying the turbocharger, as damage or contamination during removal could cause additional problems when the engine is started again.

We also disconnected the mechanical connections and mounting components securing the engine to the machine structure. All pipes and connectors were properly protected against dust, moisture and other contaminants. This is particularly important when working with crushers due to the highly dusty operating environment.

The engine was removed using a crane provided by the customer. After checking the lifting points and preparing the lifting equipment, we relieved the engine mounts and carefully lifted the unit out of the engine compartment. During lifting, our mechanics monitored the engine position to prevent damage to other crusher components.

After removal, we prepared the Cummins QSB 4.5 for transportation to our headquarters in Kojszówka, Poland. We secured the intake, exhaust, fuel and oil openings, as well as all components requiring protection during transport. At our workshop, we could carry out a complete disassembly and precise inspection of all important engine components.

### Inspection of Cummins QSB 4.5 Engine Components

After delivering the engine to our workshop, we began a detailed inspection. The unit was dismantled into individual components, which were then cleaned and prepared for visual examination and measurements. This allowed us to assess the actual degree of wear and determine which parts could be reused and which required replacement or reconditioning.

We initially focused on the crankshaft and piston assembly. We inspected the condition of the cylinders and liners, piston working surfaces and piston rings. We looked for signs of excessive friction, scoring, overheating and uneven wear. In an engine experiencing increased oil consumption, it was particularly important to check cylinder sealing and the condition of the oil control rings.

The crankshaft underwent a separate inspection. We examined the surfaces of the main and connecting rod journals, checking for signs of overheating and mechanical damage. We then measured the journal diameters and checked crankshaft runout. We also inspected the oil passages, as their cleanliness and unrestricted flow directly affect proper bearing lubrication under load.

The connecting rods were inspected for visible wear, cracks and signs of deformation. We also checked their alignment, twisting and longitudinal bending, as well as the condition of the surfaces that work with the bearings and the connecting rod bolts. These components must maintain the correct geometry, as even minor deviations can affect the durability of the crankshaft and piston assembly.

We also inspected the cylinder head. This included checking the valve seats, valve guides, valves and the cylinder head mating surface. We carried out a pressure-tightness test to identify potential cracks and leaks that may not be visible during a standard visual inspection. The procedure involves immersing the cylinder head in heated water, applying compressed air and checking for escaping air bubbles.

The camshaft was also inspected, including the condition of its main journals and cam lobes. We checked the turbocharger, fuel system and remaining engine accessories. In the case of the turbocharger, we measured axial and radial shaft play. Components of the injection system requiring more detailed examination were prepared for testing on specialist equipment.

Once all measurements had been completed, we could determine the required scope of repairs. The main priorities were restoring proper cylinder sealing, ensuring the correct operation of the crankshaft and piston assembly and maintaining appropriate lubrication parameters. A comprehensive inspection helped us avoid limiting the overhaul to replacing individual parts without addressing the actual cause of the problem.

### Complete Overhaul of the Cummins QSB 4.5 Engine

After completing the inspection, we proceeded with the actual overhaul of the Cummins QSB 4.5 engine. The scope of work was determined based on measurement results and the technical condition of individual components. Our objective was to restore the engine's correct mechanical parameters and ensure reliable operation under the demanding working conditions of the Terex Pegson Metrotrak jaw crusher.

#### Crankshaft and Piston Assembly - Repair and Component Replacement

One of the most important areas of the overhaul was the crankshaft and piston assembly. Its condition largely determines compression pressure, cylinder sealing and engine oil consumption. In the Cummins QSB 4.5, proper cooperation between the pistons, rings, cylinder liners and crankshaft is essential for achieving stable operating parameters.

After thoroughly cleaning the components, we carried out another inspection of their working surfaces and dimensions. Particular attention was paid to the cylinders and surfaces working with the piston rings. Depending on the degree of wear, components requiring replacement were substituted with new parts meeting the appropriate specifications. Preparing the cylinders and liners for installation requires maintaining the correct dimensions and tolerances specified for the particular engine.

We also prepared the pistons and piston rings. Their function is to ensure proper combustion chamber sealing, control the amount of oil on the cylinder walls and transfer the forces generated during combustion. Improper cooperation between these components can lead to excessive blow-by, increased oil consumption and reduced engine power.

The crankshaft underwent precise dimensional measurements. After assessing its condition, we determined the necessary work to restore the correct working surfaces. Where technically possible, the crankshaft journals can be reground to the appropriate undersize. Bearings matching the resulting dimensions are then selected.

During assembly of the crankshaft and piston system, maintaining the correct installation clearances and tightening torques is particularly important. Every component must be thoroughly cleaned, and the oil passages must be prepared to ensure proper lubricant flow. This helps reduce the risk of premature wear after the engine is restarted.

#### Cummins QSB 4.5 Cylinder Head Reconditioning

The cylinder head is responsible for the proper combustion process, combustion chamber sealing and gas exchange inside the cylinders. Its condition directly affects engine performance, starting reliability and stability under load. For this reason, we carried out comprehensive work on this component during the Cummins QSB 4.5 overhaul.

We started by thoroughly cleaning the cylinder head and inspecting its surfaces again. We checked the valve seats, guides and the condition of the intake and exhaust valves. The inspection also included a pressure-tightness test, which helps identify cracks and leaks that could allow coolant to enter the combustion chamber or interfere with compression pressure.

Our cylinder head reconditioning process includes surface machining, replacement of worn valve guides and replacement of valves. Depending on their technical condition, we also inspect the valve seats and their contact with the valves. All operations must be performed while maintaining the required dimensions to ensure proper sealing after installation.

After machining, the cylinder head is inspected again and prepared for installation. We pay particular attention to the cleanliness of its surfaces and the condition of the oil and coolant passages. A properly prepared component helps reduce the risk of leaks and ensures stable engine operation after the overhaul.

#### Fuel System Inspection and Repair

The fuel system in the Cummins QSB 4.5 is responsible for delivering the correct amount of fuel and ensuring proper injection according to the current engine load. Incorrect operation of the injectors or high-pressure fuel pump can cause uneven running, excessive smoke, increased fuel consumption and difficulties achieving the required power output.

During the overhaul, we inspected the fuel system components, paying attention to the condition of connections, pipes and components responsible for fuel delivery and metering. Components requiring specialist verification can be tested on a dedicated test bench. This allows us to assess their performance, tightness and consistency of operating parameters.

If any irregularities are identified, the injection pump and injectors require appropriate reconditioning or repair. Such work is carried out using specialist facilities, as precise fuel delivery has a significant impact on the efficiency and durability of the power unit.

After completing the inspection, we prepared the fuel system for reassembly. Maintaining the cleanliness of all components was essential, as even minor contaminants can negatively affect the operation of precision injection system components.

#### Turbocharger and Engine Accessories Inspection

In the Cummins QSB 4.5, the turbocharger increases the amount of air supplied to the cylinders. Its correct operation is essential for achieving the required engine power and torque. During the overhaul, we inspected the turbocharger rotor and measured axial and radial shaft play.

We also checked the oil and air pipes connected to the turbocharger. Leaks in the intake system can result in reduced boost pressure, while improper turbocharger lubrication can lead to premature wear. Therefore, it is important to inspect not only the turbocharger itself but also the components responsible for its proper operation.

We also inspected the remaining engine accessories, including the starter motor, alternator and electrical system components. Their proper condition is essential for reliable engine starting and stable operation of the control systems. All components were prepared for reinstallation or further repair according to the inspection results.

#### Professional Assembly of the Cummins QSB 4.5 Engine

After completing the reconditioning work and preparing all components, we proceeded with engine assembly. This stage requires a high level of precision, as the correct fitting of individual components determines the durability of the rebuilt engine. Before installation, every component was cleaned again, and all mating surfaces were inspected for contamination and damage.

First, we prepared the engine block and installed the crankshaft and piston assembly components. The crankshaft was fitted while maintaining the required clearances, followed by installation of the bearings and connecting rods. The pistons with their rings were then prepared and correctly installed in the cylinders. All connections were tightened according to the appropriate assembly procedures.

Next, we installed the prepared cylinder head, paying attention to the cleanliness of the mating surfaces and correct positioning of the sealing components. Further operations included installing the timing components, accessories, turbocharger and fuel system components. Throughout the process, we checked the correct positioning of individual parts and ensured that all connections were complete.

After assembling the main components, we fitted the accessories required to start the engine and carry out testing. We checked the oil passages, prepared the lubrication system and verified the correct connection of all accessories. Particular attention was also paid to the fuel, coolant and air pipes.

Once the Cummins QSB 4.5 had been assembled, it was ready for the next stage: testing on our engine dynamometer. This allowed us to assess the power unit before returning it to the Terex Pegson Metrotrak crusher.

### Cummins QSB 4.5 Engine Testing on the WIBAKO Engine Dynamometer

One of the most important stages of an engine overhaul is testing the unit after completing all workshop operations. At WIBAKO, we have an engine dynamometer that allows us to test power units under controlled conditions and real operating loads. This is a significant advantage when rebuilding engines used in construction machinery, as it allows us to assess their performance before they are installed back into the machine.

In the case of the Cummins QSB 4.5 intended for the Terex Pegson Metrotrak jaw crusher, dynamometer testing allows us to verify not only whether the engine starts correctly but also how it performs under changing load conditions. A jaw crusher requires a stable power source, so the engine must maintain the correct operating parameters even during intensive operation.

After mounting the engine on the test stand, we connect the necessary measurement and monitoring systems. Before starting the test, we check operating fluid levels, connection tightness and the preparation of the lubrication and cooling systems. We then carry out the initial starting procedure. At this stage, monitoring oil pressure, temperature and engine stability is particularly important.

The running-in process begins with operation under a light load. For a minimum of 16 hours, the engine operates at approximately 20-30% of its nominal load. This is an important period during which the components of the crankshaft and piston assembly and other cooperating surfaces can gradually bed in. During this time, we regularly monitor operating parameters and respond to any irregularities.

After the initial running-in period, we proceed with further tests. The load is gradually increased, and the engine undergoes repeated tests under different operating conditions. This allows us to check its response to load changes, rotational speed stability and the performance of the lubrication and cooling systems. We also monitor potential leaks, unusual noises and irregularities that could indicate assembly problems.

Temperature monitoring is particularly important during testing. Excessive temperature increases may indicate cooling system problems, insufficient coolant flow or other irregularities requiring further inspection. At the same time, we monitor oil pressure to assess the proper lubrication of the engine's most important components. Stable readings are particularly important in power units designed to operate for many hours under heavy loads.

The dynamometer also allows us to assess the engine's power and torque characteristics. We verify whether the engine responds correctly to increasing loads and whether its operation remains stable throughout the tested operating range. If necessary, additional diagnostics can be performed to inspect components responsible for engine performance.

It is worth emphasising that testing an engine outside the machine allows us to identify potential problems without having to remove the unit from the crusher again. This is an important benefit for the customer, as it reduces the risk of machine downtime caused by faults that might otherwise only become apparent during operation on a construction site or at an aggregate processing facility.

After completing the tests and confirming the correct operation of the Cummins QSB 4.5, the engine is prepared for transportation and reinstallation in the Terex Pegson Metrotrak jaw crusher.

### Installation of the Cummins QSB 4.5 Engine in the Terex Pegson Metrotrak Jaw Crusher

After successfully completing the dynamometer tests, we proceeded to prepare the engine for reinstallation. Engine installation is just as important as the overhaul itself, as even a correctly rebuilt engine requires proper connection of all cooperating systems. In the Terex Pegson Metrotrak crusher, particular attention must be paid to the mechanical, fuel, electrical, cooling, intake and exhaust connections.

The engine was prepared for transportation from our headquarters in Kojszówka to the crusher's operating location. Once on site, we inspected the engine compartment and prepared all mounting points. Before starting the installation, we made sure that the mounting surfaces were clean and that the structural components were free from damage that could interfere with the correct positioning of the engine.

As during removal, we used a crane provided by the customer to position the engine inside the compartment. The power unit was properly secured with lifting equipment and gradually lowered into its designated position. Throughout the operation, our mechanics monitored its alignment with the mounting points to avoid damaging the housing, pipes and other components located inside the compartment.

Once the engine was positioned, we installed the mounts and completed the mechanical connections. Particular attention was paid to the correct positioning of the engine mounting brackets and components cooperating with the machine's drive system. All connections were checked for stability and proper tightening. Incorrect engine mounting could cause excessive vibration, place additional stress on connections and accelerate the wear of cooperating components.

The next stage involved connecting the fuel system. We installed the supply and return lines, ensuring that they were correctly routed and protected against contact with moving and hot components. All connections were checked for leaks. We then connected the electrical system, sensors and wiring required for the correct operation of the engine control unit.

We also devoted considerable attention to the cooling system. The coolant pipes were connected, and their technical condition was checked. If any wear or damage is identified, the pipes must be replaced, as a leak in the cooling system can lead to engine overheating. After completing the connections, we filled the system and checked it for leaks.

Preparing the intake and exhaust systems was another important part of the installation. We installed the air pipes leading to the turbocharger and the components connecting the engine to the exhaust system. We checked the condition of clamps, connectors and pipes. Leaks in the intake system could cause reduced boost pressure and lower engine performance, while incorrect exhaust connections could allow exhaust gases to enter the engine compartment.

After completing all connections, we prepared the engine for its first start. We installed new service filters, filled the engine with oil and coolant and checked the levels of all other operating fluids. We then inspected all connections and carried out preliminary checks to ensure that the engine was ready for safe starting.

The first start was carried out with our service technicians present. After starting the engine, we monitored oil pressure, temperature, rotational speed stability and the engine's response to operator commands. We also checked for fuel, oil and coolant leaks. The air pipes and exhaust system connections were inspected as well.

Next, we carried out functional tests of the crusher together with the operator. We gradually checked the engine's behaviour under different operating conditions, observing its response as the load increased. It was important to confirm that the engine provided stable operation of the drive system and showed no concerning symptoms during operation. After the tests were completed successfully and no leaks were detected, we finalised the installation and prepared a service report confirming the work performed.

### Post-Overhaul Cummins QSB 4.5 Engine Maintenance

A complete overhaul of the Cummins QSB 4.5 engine does not end with its reinstallation and first start. To maintain the correct operating parameters and ensure the durability of the rebuilt components, it is important to follow the post-overhaul maintenance schedule. This is particularly relevant for machines such as the Terex Pegson Metrotrak, which often operate for many hours in dusty environments and under varying loads.

At WIBAKO, we recommend carrying out the first inspection after **50 operating hours from the engine's restart**. Our service team can travel directly to the customer and inspect the engine at its operating location. During this visit, we check the technical condition of the unit, replace the required filters and inspect all connections made during installation.

The 50-hour inspection involves more than simply replacing filters. We check oil pressure, operating temperature, the tightness of the cooling, fuel and lubrication systems and the condition of the air pipes. We also inspect the engine mounts, electrical connections and accessories. This allows us to identify potential leaks or irregularities that may have appeared during the first hours of operation.

After the first inspection, we recommend further maintenance every 250 operating hours, but no less frequently than once every three months. Regular servicing helps maintain the engine in good technical condition and reduces the risk of unexpected crusher downtime.

Engines supplied by WIBAKO after an overhaul are covered by a warranty. We also provide ongoing maintenance services, allowing customers to receive support from our mechanics after the repair work has been completed.

### Machines Equipped with the Cummins QSB 4.5 Engine

The Cummins QSB 4.5 is used in various types of construction, industrial and municipal machinery. Its design makes it suitable for equipment requiring a reliable power source and stable operating parameters. In addition to the Terex Pegson Metrotrak jaw crusher, engines from the QSB 4.5 family can also be found in other working machines.

Cummins QSB 4.5 engines are used, among others, in selected models of:

Wheel loaders: Hyundai HL730-9, John Deere 244J, John Deere 304J.

Crawler excavators: New Holland E195B, LiuGong 915E.

Telehandlers: JLG 1055.

Crushing and screening equipment: selected models of mobile crushers and screening plants.

For each machine, the exact engine version should be verified using the engine identification plate, serial number or unit designation. As part of our Cummins engine services, we provide diagnostics, removal, complete overhauls, installation and engine dynamometer testing.

### Comprehensive Cummins Engine Service at WIBAKO

The repair of the Cummins QSB 4.5 engine in the Terex Pegson Metrotrak crusher demonstrates the importance of taking a comprehensive approach to power unit overhauls. Simply eliminating visible symptoms does not guarantee a lasting result. Only detailed diagnostics, component inspection, properly performed reconditioning and load testing can restore the engine's operating efficiency.

At WIBAKO, we have been involved in the supply of construction machinery parts and servicing for over 30 years. We carry out diesel engine overhauls for excavators, wheel loaders, crushers, screening plants, material handlers and other industrial machines. Our workshop facilities in Kojszówka, Poland, allow us to carry out comprehensive inspections and repairs of engines from various manufacturers.

We also provide mobile construction machinery service. Our mechanics perform engine removal and installation directly at the customer's location throughout Poland. Depending on the requirements, we can carry out on-site diagnostics, remove the engine and transport it to our workshop, then reinstall it in the machine once the overhaul has been completed.

An important part of our offer is our engine dynamometer, which allows us to test rebuilt units before installation. Testing under controlled conditions makes it possible to assess operating stability, lubrication and cooling parameters, as well as engine behaviour under increasing loads.

We service engines manufactured by Cummins, Caterpillar, Deutz, Perkins, Liebherr, Kubota and other manufacturers. Our services include complete overhauls as well as repairs of individual components. We also service power units installed in Terex Pegson machinery and other equipment used in the aggregate processing and recycling industries.

### FAQ - Frequently Asked Questions About the Cummins QSB 4.5 Engine Overhaul

#### Can I have my Cummins QSB 4.5 engine overhauled without transporting the entire crusher to your workshop?

Yes. There is no need to transport the entire Terex Pegson Metrotrak crusher to our headquarters. Our mobile service team can remove the engine directly at the customer's location and transport it to our workshop in Kojszówka, Poland. Once the overhaul and dynamometer tests have been completed, we arrange for the engine to be reinstalled in the machine.

#### What symptoms indicate that the Cummins QSB 4.5 engine requires an overhaul?

The most common warning signs include gradual power loss, increased engine oil consumption, excessive exhaust smoke, starting difficulties and unusual noises coming from the power unit. These symptoms do not always mean that a complete overhaul is necessary. This is why we carry out diagnostics and inspect the technical condition of the engine before making a final decision.

#### Is the Cummins QSB 4.5 engine tested under load after an overhaul?

Yes. After completing the overhaul, we can test the engine on our engine dynamometer. The unit initially undergoes a running-in period at approximately 20-30% of its nominal load, followed by further tests under gradually increasing loads. We monitor temperature, oil pressure, rotational speed stability and the engine's response to load changes.

#### Do you also repair hydraulic systems in Terex Pegson crushers?

Yes. In addition to diesel engine overhauls, we also repair and recondition hydraulic system components. Our services include hydraulic pump, hydraulic motor, control valve and hydraulic cylinder repairs. We can also carry out diagnostics directly on the machine, checking operating pressures and flow rates.

#### How should I prepare an engine for an overhaul?

Before starting cooperation, it is worth preparing information about the machine model, engine designation and the symptoms observed during operation. Photos of the engine identification plate and the engine serial number are also helpful. This information allows us to initially determine the required scope of work and prepare for diagnostics. If the engine is still installed in the machine, our service team can travel to the site and remove it.

#### How often should an engine be serviced after an overhaul?

We recommend the first inspection after 50 operating hours from restarting the engine. During this visit, we inspect the engine, replace the required filters and check all system connections. Subsequent inspections should be carried out every 250 operating hours, but no less frequently than once every three months. Our mobile service team can perform these operations directly at the machine's operating location.

### Need a Cummins QSB 4.5 Engine Overhaul?

Trust your engine repair to WIBAKO specialists. We provide Cummins engine overhauls, engine dynamometer testing and mobile engine removal and installation for crushers and other construction machinery.

[+48 33 870 42 00](tel:+48338704200) [biuro@wibako.pl](mailto:biuro@wibako.pl) [Formularz](https://wibako.com/contact)

Published: 2026-11-19

---

Source: https://wibako.com/about-us/technical-hub/939-overhaul-of-the-cummins-qsb-4-5-engine-in-the-terex-pegson-metrotrak-crusher
Contact: +48338704200, biuro@wibako.pl